Approved change · 6 minutes
Verify and roll back a change
Prove the result in the real project, then safely undo it when needed.
Use this guide with Aura
Open Aura, then keep this guide beside it while you follow the steps. Aura does not receive the page text, your account, your project, or anything you typed.
If nothing opens, start Aura normally. The written steps still work.
Before you start
- A reviewed change has completed.
- Do not make unrelated manual edits to the same target before rollback.
Plan and model funding
A natural-language follow-up may use the selected model. A visible rollback control itself is a local recovery action.
Say this in ordinary language
I do not like that change. Put it back.
Steps
-
1
Run the game or the relevant project check.
What you should see: You see the actual behavior, not only a success message.
-
2
If the result is wrong, use Rollback or ask Aura to put the change back.
What you should see: Aura identifies the recoverable change and restores it.
-
3
Run the same check again.
What you should see: The previous behavior is restored.
What Aura may change
Rollback restores the recorded pre-change state for the recoverable action.
How to verify it worked
Repeat the exact before/after test after rollback.
Undo or recover
This tutorial is the rollback path. Source control remains the final recovery layer for unrelated or conflicting manual edits.
Common problems
- If Aura reports a revision conflict, stop and review the changed file instead of forcing an overwrite.
- If rollback data is unavailable, use source control or your project backup.